Welcome, Guest Sign InSign Up

sell electrofusion reducer coupler 110-75mm

Trade Leads Details
EF REDUCER COUPLER PE100, SDR11 110mm*75mm Inner Diameter. For water, mining and irrigation applications. All fittings are manufactured in virgin PE100 white polyethylene. EF fittings enable utilities, designers and contractors to create fully welding pipe networks.
An electrofusion reducer fitting is used to join two lengths of PE pipe that are of different diameters. EF reducer fittings are also used to join a long spigot fitting to a piece of pipe, where one of them is larger or smaller diameter than the other.

Product Description:
EF REDUCER COUPLER 110mm*75mm for water, mining and irrigation applications. Water PN16.
Temperature range on EF fittings: -15℃/+40℃
Design standards:
※The Jiufeng Supplier co., have over 40 inland and international product approvals as well as ISO9001 quality management system approvals. GB/T13663.3-2018
※JIUFENG branded electrofusion fittings are 3rd party certified against the products standards listed.

JIUFENG BRAND
Features:
※JIUFENG branded.
※PE 100 raw best quality choice.
※Water PN16 (Depending on PE pipe welded and any local pipeline pressure regulations).
※Full production tracking records and random inspection records.
※CNC wiring copper line, ODM special work blade for inner tube. The wear resistance is increased and the wiring layer is optimized, so as to improve the efficiency of the hot-melt process of fitting.
※All EF fittings are individually numbered and the barcodes and QR code full individual fitting traceability right back to all raw materials and critical components.
※Manual welding parameters printed into the body of the fitting.
※After authorization, OEM is accepted.
Operations Accessories:
※Electrofusion Control box, Pipe cutters, Pipe scrapers, Pipe alignment and Rounding clamps, Generators, Marker pen.




Attention:
※ Work plan for laying pipes and welding joints site shall be designed in advance.
※ Outdoor welding is prohibited in rainy days.
※ Before welding, need the injection Roughness &Clean &Remark.
※ After 24hours welding, need pressure testing, and pipeline air discharging.


Comments:
Check that both pipes and fitting to be joined are compatible, only compatible materials should be joined together. Check PN and SDR rating marked on fitting and compare with that of the pipe. If in doubt, seek advice from our manufacturer, Correct installation procedures should be followed.
Contact Information
  • Contact PersonAndrew Lee
  • Telephone0086-191539-87729
  • AddressLinyi Hi-tech zone Linyi city. Shandong Province, China