Welcome, Guest Sign InSign Up
Trade Leads Details
1,Introduction
Geomembrane connection lock is connected to the film developed and concrete is extruded hdpe strip products, e or t-shaped in cross-section is suitable firmly anchored in concrete.

2,Feature
(1) geomembrane connection lock is a flexible waterproof material, with high seepage coefficient.
(2) having good heat resistance and cold resistance, the temperature of the environment of high temperature 110 o C, low temperature -70
(3) has good chemical stability, resistant to acid, alkali, oil, corrosion is good anti-corrosion materials.
(4) has a very high tensile strength, it has a high tensile strength to meet the high standards of project needs
(5) has a strong weather resistance, has a strong anti-aging properties, and prolonged use can maintain the original performance
(6) has a strong tensile strength and elongation at break, so HDPE geomembrane can be used in a variety of harsh geological and climatic conditions. Strong adaptability to adapt to uneven settlement.
(7) excellent UV stability


3,Application
(1) Environmental protection, sanitation (such as landfills, sewage treatment plants, power conditioning tank, industrial, hospital solid waste treatment plant slope)
(2) Hydraulic Engineering (reservoir dam seepage, consolidation, vertical heart wall, slope protection)
(3) Municipal Engineering (subway, underground engineering buildings, sewers lining)
(4) Garden (artificial lakes, rivers, reservoirs, golf course pond slope)
(5) Petrochemical (tank seepage, chemical reaction tanks, sedimentation tanks lined chemical plants, oil refineries, gas stations)
(6)Mining (washing pool, heap leaching pool, the ash field, dissolving tanks, sedimentation tanks, tailings seepage slope)
(7)Mining (washing pool, heap leaching pool, the ash field, dissolving tanks, sedimentation tanks, tailings seepage slope)
(8) Transport facilities (foundation reinforcement, subway, highway culvert seepage).

4, Installation Instructions
E or T-lock installed in a position reserved for a period of recess when pouring concrete, to be impervious construction of the E or T-type lock embedded in the groove, and pouring concrete forming again, lock that is fixed on the surfaces of buildings,Laying of HDPE geomembrane extrusion welding and E-lock connection.
Contact Information
  • Contact Personrose
  • Telephone0086 551 62372127
  • Address18F, Block C, Winning Ocean Plaza, No.680 South Maanshan Road, Hefei 230041 China