Welcome, GuestSign InSign Up
Position - - / - - Detail

Reiforced plastic ball transfer unit CY-25A

Product Details

Reiforced plastic ball transfer unit CY-25A
Reiforced plastic ball transfer unit CY-25A
Reiforced plastic ball transfer unit CY-25A
Reiforced plastic ball transfer unit CY-25A
Reiforced plastic ball transfer unit CY-25A
Product information

Loading capacity Unit weight
Unit Load Allowable load
40kg 45kg 85g

Model No.
Ball sizeLoading capacity
Maximum/Breaking
SP-8 8MM 8KG/15KG
SP-12 12MM 25KG/30KG
SP-151 5.875MM 40KG/50KG
SP-22 22.23MM 140KG/160KG
SP-25 25.4MM 180KG/200KG
SP-30 30.16MM 250KG/300KG
SP-45 45MM 450KG/500KG
SP-60 60MM 800KG/1200KG
SP-76 76MM 2000KG/2500KG
SP-90 90MM 3000KG/3500KG
SP-8FL 8MM 8KG/15KG
SP-15FL 15.875MM 40KG/45KG
SP-22FL 22.23MM 140KG/160KG
SP-30FL 30.16MM 200KG/230KG
SP-45FL 45MM 400KG/450KG

Company Infromation

Qingdao Pingyang International Trading Co., Ltd., was established in 2014,a famous and professional ball transfer unit supplier.

we are located in Qingdao, north of China. Our factory near the Qingdao Liuting International Air Port and Huangdao Sea Port,the traffic is very convenient.

Which specializes in Industrial Casters. Bead Roller Machine . Hand Trolley. Corner Guards . Wire Springs
.
If you want to get high quality ball tansfer unit, please visit Qingdao Pingyang International Trading Co., Ltd.

Contact Us

If you want to get more information about Qingdao Pingyang or ball transfer unit,please feel free to contact us as follows.we will feedback to you within 24 hours.

Advantage:

1. enable to convey goods from every direction.
2. simple structure, smooth running
3. durable, good looks
4. competitive price

5. able to carry high loads

6. with chromel steel ball bearing

7. with a high load-bearing capacity

8. self-lubrication, precision machined and low friction

9. low noise, stable performance and durable

10. able to work in sub-zero temperatures and have low rolling resistance

11. suitable for countless applications: sliding pipe, machine equipment and other sliding systems

4.Material of universal ball ball transfer units


1:Chrome steel
2:Stainless steel
3:ceramic
4:plastic

Delivery time

For parts in stock: delivery time within 3 days
For most of the orders: delivery time within 30 days
For special parts, big order, or unpopular items: delivery time from 30-60 days
For urgent orders: we could speed up and deliver faster.
Please send us the exact part numbers and order quantities in order to get a specific delivery time.

Contact Information

Contact PersonAmy
Telephone86-532-66730972
Fax Number
Websitewww.qdpacific.com
Post Code
AddressRoom 1296 Tongshan Road,ShiBei District,Qingdao ,China
About Us - Contact Us - Privacy Policy - Daily Updates - Report Abuse